2. Preparing the Wall

For new home construction, the roughing stage to the final installation may take several months. The BigVizion packaging has been designed for the master frame (Outer Master Frame) to be installed during the roughing stage. Follow the listed steps for installation:

Wall Preparation:

Step 1:

The location of the installation will be determined by environmental factors such as wall depth, lighting and ideal viewing heights.

The ideal vertical placement of the BigVizion in the wall opening created, as measured from the floor to the sill (bottom of the screen) for seated viewing, is as follows:

Model

Screen Size

Height from seated position

 

 

 

BVHD3100

100"

~ 20.5"

BVHD3090

90"

~ 23"

 

 

 

BVHD3080

80"

~ 25.5"

 

 

 

NOTE: The above are recommendations, the final decision will be determined by the installation professional based on room and environmental factors.

For more information, please visit our website at:

Installation Guide

http://www.optomausa.com/BigVizion

 

Page 8
Image 8
Optoma Technology HDBV3090, HDBV3100, HDBV3080 manual Preparing the Wall, Wall Preparation Step