Installation Guide
HDBV3100, HDBV3090, HDBV3080
2. Preparing the Wall
For new home construction, the roughing stage to the final installation may take several months. The BigVizion packaging has been designed for the master frame (Outer Master Frame) to be installed during the roughing stage. Follow the listed steps for installation:
Wall Preparation:
Step 1:
The location of the installation will be determined by environmental factors such as wall depth, lighting and ideal viewing heights.
The ideal vertical placement of the BigVizion in the wall opening created, as measured from the floor to the sill (bottom of the screen) for seated viewing, is as follows:
Model | Screen Size | Height from seated position |
|
|
|
BVHD3100 | 100" | ~ 20.5" |
BVHD3090 | 90" | ~ 23" |
|
|
|
BVHD3080 | 80" | ~ 25.5" |
|
|
|
NOTE: The above are recommendations, the final decision will be determined by the installation professional based on room and environmental factors.
For more information, please visit our website at: | Installation Guide | |
http://www.optomausa.com/BigVizion | ||
|