Ref. No. 2D Procedure 2A
2C
2D Removal of the gear box block.
1. Loosen the 4 screws where securing the driving block with the
housing in order to take out the gear box block from the main unit.
2. Remove the 4 screws and carefully open the gear box housing.
NOTE:
The internal parts of gear box block can be removed one after
another.
NOTE:
The spring of spindle lock button may pop out.
Ref. No. 2E Procedure 2A
2C
2D
2E Assembly of the motor assembly.
1. Take out the motor rotor assembly from the motor stator.
2. Take out the current case.
3. Remove the 2 screws fastening the motor stator.
4. Take out the stator.
5. Take out the motor brush and switch assembly connected with
lead wires.
NOTE:
Loosen the 2 housing screws and take the housing C out for re-
assembling purpose.
6
EY3551-U1 / EY3552-U1