7

FIGURE 12

STEP 12:

Route the new PRESS STACK CABLE (7) thru the PEC STATION as shown. (NOTE: Remove pulleys for ease of installation.) Slide GUIDE RODS up just enough to get the cable end thru. Push GUIDE RODS down when finished.

STEP 13:

Route the new PRESS STACK CABLE (7) around the pulleys in the BOOM BRACKET using the existing bolts as shown in FIGURE 13. (NOTE: Make sure the cable runs in the grooves of the pulleys.)

Screw the threaded end of the PRESS STACK CABLE (7) into the end of the HEAD PLATE. See FIGURE 13.

FIGURE 13

BOOM

BRACKET

7

HEAD

PLATE

13

Page 13
Image 13
ParaBody 883 manual Boom