FIGURE 15

 

 

14

 

WEIGHT

 

STACK

9

CABLE

 

2

 

13 3/8 X 1-3/4”

6

 

10

 

STEP 15:

Assemble two 3-1/2” PULLEYS (9) to the LEFT BOOM BRACKET (2) using two 3/8 X 1-3/4” BOLTS (13) and two 3/8” LOW HEIGHT LOCK NUTS (14) as shown in FIGURE 15.

Route the WEIGHT STACK CABLE around the pulleys in the LEFT BOOM BRACKET (2) as shown in FIGURE 15. (NOTE:

Make sure the cable runs in the grooves of the pulleys.)

Assemble the WEIGHT STACK PIN (10) to the HEAD PLATE (6) as shown in FIGURE 15.

Screw the long threaded end of the WEIGHT STACK CABLE into the end of the HEAD PLATE (6) .See FIGURE 15.

 

1/2

 

1/2

 

1/2

 

1/2

 

1/2

 

 

1/2

0

1

2

3

4

5

6

25

Page 25
Image 25
ParaBody 883 manual Make sure the cable runs in the grooves of the pulleys