| Model 4520 & 4110 Series Getting Started Guide | 3 • Installation | 
| 
 | 
 | 
Installation checklist
The installation checklist (see table 5) lists the tasks for installing a SmartNode 4520 or 4110 Series router. Make a copy of this checklist and mark the entries as you complete each task. For each SmartNode 4520 or 4110 Series router, include a copy of the completed checklist in your site log.
Table 5. Installation checklist
| Task | Verified by | Date | 
| 
 | 
 | 
 | 
| Network information available & recorded in site log | 
 | 
 | 
| 
 | 
 | 
 | 
| Environmental specifications verified | 
 | 
 | 
| 
 | 
 | 
 | 
| Site power voltages verified | 
 | 
 | 
| 
 | 
 | 
 | 
| Installation site  | 
 | 
 | 
| 
 | 
 | 
 | 
| Required tools available | 
 | 
 | 
| 
 | 
 | 
 | 
| Additional equipment available | 
 | 
 | 
| 
 | 
 | 
 | 
| All printed documents available | 
 | 
 | 
| 
 | 
 | 
 | 
| SmartWare release & build number verified | 
 | 
 | 
| 
 | 
 | 
 | 
| Rack, desktop, or wall mounting of chassis completed | 
 | 
 | 
| 
 | 
 | 
 | 
| Initial electrical connections established | 
 | 
 | 
| 
 | 
 | 
 | 
| ASCII terminal attached to console port | 
 | 
 | 
| 
 | 
 | 
 | 
| Cable length limits verified | 
 | 
 | 
| 
 | 
 | 
 | 
| Initial configuration performed | 
 | 
 | 
| 
 | 
 | 
 | 
| Initial operation verified | 
 | 
 | 
| 
 | 
 | 
 | 