Adjusting Mount Extension

7

While supporting the weight of the projector, loosen clamp plate screws half a turn and position projector to the

desired extended position. Retighten clamp plate screws securely.

WARNING

On ceiling installations, clamp plate adjustment screws support weight of projector when fully tightened. Weight of the projector will need to be supported if clamp plate screws are loosened.

CEILING INSTALLATION

CLAMP PLATE

SCREWS

D

WALL INSTALLATION

(EXCEPT FOR EXC MODELS)

CLAMP PLATE

 

SCREWS

D

Install Cable Covers

8

Cut cable covers (Q) to the length of inner channel (C) and outer channel (B) openings, leaving space for cables if

routed through channels. Snap cable covers (Q) into openings as shown.

CEILING INSTALLATION

 

WALL INSTALLATION

Q

 

 

 

 

(EXCEPT FOR EXC MODELS)

 

 

 

 

 

 

CUT TO

 

 

 

 

 

 

LENGTH OF

 

 

 

 

 

 

OPENING

 

 

 

Q

 

C

B

 

 

 

 

 

 

Q

B

CUT TO

 

 

 

 

LENGTH OF

 

 

Q

 

CUT TO

OPENING

 

 

 

LENGTH OF

 

 

 

 

 

OPENING

C

 

 

 

CUT TO

 

 

 

 

LENGTH OF

 

 

 

 

 

 

 

 

OPENING

 

 

 

CABLES

 

 

CABLES

 

 

 

 

 

 

 

 

 

 

10 of 11

ISSUED: 1-11-08 SHEET #: 055-9495-2

10-16-08

Visit the Peerless Web Site at www.peerlessmounts.com

 

For customer care call 1-800-865-2112 or 708-865-8870.

Page 10
Image 10
Peerless Industries EXB-S, EXC-S Adjusting Mount Extension, Install Cable Covers, Ceiling Installation Wall Installation