Pelco DX9100 installation manual Weekly Recording Schedule

Models: DX9100

1 86
Download 86 pages 11.33 Kb
Page 51
Image 51
WEEKLY RECORDING SCHEDULE

WEEKLY RECORDING SCHEDULE

NOTE: To make sure there is no delay during scheduled recording, begin the recording at least five minutes before the actual recording time. For example, schedule a recording at 7:55 a.m. instead of 8:00 a.m.

1.Select the ÒWeekly recording scheduleÓ radio button.

2.Click Continuous or ÒEvent record.Ó

3.In the time bars, click the desired start/end times for recording for each day of the week, or enter the exact start/end times in the ÒFine tuneÓ fields.

4.Click Apply.

The example below shows a Continuous weekly recording schedule from 7:05 a.m. to 12:05 p.m. The boxes in the time bars are blue with a red border. You can make the boxes smaller or larger by dragging them with your mouse.

Figure 63. Continuous Weekly Recording Schedule Page

The example below shows a weekly Event record schedule from 7:05 a.m. to 12:05 p.m. The boxes in the time bars are yellow with a red border. You can make the boxes smaller or larger by dragging them with your mouse.

Figure 64. Weekly Event Recording Schedule Page

To delete a time period:

1.Click ÒNo record.Ó

2.Click the boxes in the time bars.

C636M-E (4/05)

51

Page 51
Image 51
Pelco DX9100 installation manual Weekly Recording Schedule