Pella 803V0102 installation instructions 3SETTING AND FASTENING THE DOOR CONTINUED, 3F a, 3F b,c

Models: 803V0102

1 12
Download 12 pages 57.54 Kb
Page 5
Image 5
3SETTING AND FASTENING THE DOOR (CONTINUED)

3SETTING AND FASTENING THE DOOR (CONTINUED)

F.Doors with vertical mullions only: Fasten the door sill to the rough opening sill using one of the following screw types and locations.

a.Doors using aluminum sill support: Drill a 5/32" diameter hole 1" from each of the mulled door jambs through the door sill and the aluminum sill support. Place a bead of sealant in each hole and install a #10 x 3/4" self tapping flat head screw in each hole.

3F

a

3F

b,c

b.Doors on concrete: Drill a 5/32" diameter hole 1" from each of the mulled door jambs through the door sill and into the concrete floor. Place a bead of sealant in

each hole and install a 3/16" x 1-3/4" corrosion resistant masonry screw in each hole.

Note: The hole may be placed on either side of the track. Place the hole in the best location to prevent the concrete from breaking at the screw location.

c.Doors with wood floors or wood sill supports: Drill a 5/32" diameter hole 1" from each of the mulled door jambs through the door sill. Place a bead of sealant in each hole and install a #10 x 1-1/2" corrosion resistant flat head wood screw in each hole.

4INTEGRATING THE DOOR TO THE WATER RESISTIVE BARRIER

A. Apply side flashing tape. Cut two pieces of flashing tape

4" longer than the frame height of the door. Apply one 4A" piece to each side over the nailing fin and onto the water resistive barrier. The tape should extend 2" above the

top of the door and 2" below the bottom of the door. Press the tape down firmly.

 

 

&YUFSJPS

B. Apply top flashing tape. Cut

 

 

a piece of flashing tape long

 

 

enough to go across the top of

 

 

the door and extend at least 1"

 

 

past the side flashing tape on

 

 

both sides. Apply the tape over

4B#

 

the top nailing fin as shown.

 

 

 

Note: The tape should cover

 



the entire nailing fin, but not

 

 

extend onto the door frame. The

 

 

top flashing tape must overlap the side

 

flashing tape to prevent water from getting behind it.

&YUFSJPS

&YUFSJPS

C. Fold down top flap of water resistive barrier.

4C$

D. Apply flashing tape to diagonal cuts. Cut pieces of

flashing tape at least 1" longer than the diagonal cuts 4D% 3F in the water resistive barrier. Apply the tape coveringManual background the entire diagonal cut in the water resistive barrier at

both upper corners of the door.

Note: Be sure to overlap the top corners.

Page 5
Image 5
Pella 803V0102 installation instructions 3SETTING AND FASTENING THE DOOR CONTINUED, 3F a, 3F b,c