Install the IntelliChlor cell assembly no closer than three (3) feet from the heater outlet, if used. For more information see plumbing diagrams on page 3 and 4.

Note: After new pool construction has been completed, in order to prevent debris from entering the IntelliChlor cell assembly, it is recommended that the IntelliChlor pass-through cell (P/N 520588) be installed before installing the IntelliChlor cell. After the pool system has flushed the debris from the pipes, remove the pass-through cell and install the IntelliChlor cell.

Note: Pipe couplings: Schedule 80, maximum pressure 75 psi to 70° F

Coupling

Coupling

To install the cell:

1.Using PCV glue, mount the PVC couplings to the plumbing pipe. Allow the glue to dry.

2.Mount the cell to allow access to the control panel. Install the cell onto the couplings. Ensure the O-rings are seated properly.

3.Switch on the pump and visually inspect for leaks around the couplings.

Connecting the Cell Power Cable to the Power Center

After the cell installation is completed, connect the power cable to the Power Center:

Align the four pins of the cell power cord connector with the socket on the bottom of the Power Center and insert the connector. Turn the round socket nut until it locks the connector in place.

Connector socket nut.

Note: Pipe couplings: Schedule 80, maximum pressure 75 psi to 70° FTo cell assembly