Thermo Products OH8FA119D60R, OH8FA119DV5R COMBUSTION HEAD SETTING FOR 2-STAGERIELLO BURNER

Models: OH6FA072D48R OH8FA119D60B OH6FA072DV4B OH8FA119DV5B OH6FX072DV4R OH6FA072DV4R OH6FA072DV4N OH6FA072D48N OH6FA072D48B OH8FA119D60R OH8FA119DV5R

1 78
Download 78 pages 920 b
Page 45
Image 45
COMBUSTION HEAD SETTING FOR 2-STAGE RIELLO BURNER:

Figure 19: Preliminary Adjustment of Burner Air Band and Air Shutter

i.When ignition is established, make a preliminary burner air adjustment to attain a clean combustion flame. Generally, the burner bulk air band should be about 3/16 inch open and the opening of the burner air shutter set in the range of “2” to “7”, refer to Figure 19.

Replace the inspection cover above the burner.

j.After the appliance is warmed up to a steady state condition (about 15 minutes), the final burner adjustment should be made using combustion instrumentation for smoke, carbon dioxide (CO2)

or excess oxygen (O2), and flue gas temperature. In order to achieve the most efficient combustion, the following steps must be taken:

COMBUSTION HEAD SETTING FOR 2-STAGE RIELLO BURNER:

This is done when fitting the nozzle, with the blast tube removed. It depends on the output of the burner and is carried out by rotating the regulating rod, till the terminal plane of the blast tube is level with the set-point, as indicated in the schedule.

In figure 20 the combustion head is set for an output of 0.75 GPH at 130 psi, while the shutter is level with set- point 2.5, as required by the above schedule.

Figure 20

42

Page 45
Image 45
Thermo Products OH8FA119D60R, OH8FA119DV5R, OH6FA072D48B, OH6FA072D48N COMBUSTION HEAD SETTING FOR 2-STAGERIELLO BURNER