Pentair Model 5600 & 5600 Econominder, 40106 Rev. H 05/05 manual Service Instructions

Models: 40106 Rev. H 05/05 Model 5600 & 5600 Econominder

1 36
Download 36 pages 13.06 Kb
Page 23
Image 23
Service Instructions

Model 5600 & 5600 Econominder®

Service Instructions

Replace Time Brine Valve, Injectors and Screen

1.Unplug electrical cord from outlet.

2.Turn off water supply to conditioner:

If the conditioner installation has a “three valve” bypass system, first open the valve in the bypass line, then close the valves at the conditioner inlet and outlet.

If the conditioner has an integral bypass valve, put it in the Bypass position.

If there is only a shut-off valve near the conditioner inlet, close it.

3.Relieve water pressure in the conditioner by putting the control in the Backwash position momentarily. Return the control to the In Service position.

4.Disconnect brine tube and drain line connections at the injector body.

5.Remove the two injector body mounting screws. The injector and brine module can now be removed from the control valve. Remove and discard valve body o-rings.

6.Replace brine valve.

Pull brine valve from injector body, also remove and discard o-ring at bottom of brine valve hole.

Apply silicone lubricant to new o-ring and reinstall at bottom of brine valve hole.

Apply silicone lubricant to o-ring on new valve assembly and press into brine valve hole, shoulder on bushing should be flush with injector body.

7.Replace injectors and screen.

Remove injector cap and screen, discard o-ring. Unscrew injector nozzle and throat from injector body.

Screw in new injector throat and nozzle, be sure they are seated tightly. Install a new screen.

Apply silicone lubricant to new o-ring and install around oval extension on injector cap.

8.Apply silicone lubricant to three new o-rings and install over three bosses on injector body.

9.Insert screws with washers through injector cap and injector. Place this assembly through hole in timer housing and into mating holes in the valve body. Tighten screws. (Be sure to reinstall brass spacers with injector on model 4600 valve.)

10.Reconnect brine tube and drain line.

11.Return bypass or inlet valving to normal In Service position. Water pressure automatically builds in the conditioner. NOTE: Be sure to shut off any bypass line.

12.Check for leaks at all seal areas. Check drain seal with the control in the Backwash position.

13.Plug electrical cord into outlet.

14.Set time of day and cycle the control valve manually to assure proper function.

Make sure control valve is in the In Service position.

15.Make sure there is enough brine in the brine tank.

16.Rotate program wheel counterclockwise until it stops at Regeneration position.

17.Start regeneration cycle manually if water is hard.

23

Page 23
Image 23
Pentair Model 5600 & 5600 Econominder manual Service Instructions, Replace Time Brine Valve, Injectors and Screen