Model 5600 & 5600 Econominder®

Service Instructions (Cont’d.)

Replace Meter

1.Unplug electrical cord from outlet.

2.Turn off water supply to conditioner:

If the conditioner installation has a “three valve” bypass system, first open the valve in the bypass line, then close the valves at the conditioner inlet and outlet.

If the conditioner has an integral bypass valve, put it in the Bypass position.

If there is only a shut-off valve near the conditioner inlet, close it.

3.Relieve water pressure in the conditioner by putting the control in the Backwash position momentarily. Return the control to the In Service position.

4.Pull cable out of meter cover.

5.Remove two screws and clips at bypass valve or yoke. Pull resin tank away from plumbing Connections.

6.Remove two screws and clips at control valve. Pull meter module out of control valve.

7.Apply silicone lubricant to four new o-rings and assemble to four ports on new meter module.

8.Assemble meter to control valve. Note, meter portion of module must be assembled at valve outlet.

9.Attach two clips and screws at control valve. Be sure clip legs are firmly engaged with lugs.

10.Push resin tank back to the plumbing connections and engage meter ports with bypass valve or yoke.

11.Attach two clips and screws at bypass valve or yoke. Be sure clip legs are firmly engaged with lugs.

12.Return bypass or inlet valving to normal In Service position. Water pressure automatically builds in the conditioner. NOTE: Be sure to shut off any bypass line.

13.Check for leaks at all seal areas.

14.Plug electrical cord into outlet.

15.Set time of day.

Make sure control valve is in the In Service position.

16.Rotate program wheel counterclockwise until it stops at Regeneration position.

17.Start regeneration cycle manually if water is hard.

18.Plug cable into meter cover. Rotate cable to align drive flat if necessary.

27

Page 27
Image 27
Pentair Model 5600 & 5600 Econominder, 40106 Rev. H 05/05 manual Replace Meter