Pentax ETH-310, ETH-302, ETH-305 Preparation for Surveying, Setting up the instrument

Models: ETH-310 ETH-302 ETH-305

1 48
Download 48 pages 31.51 Kb
Page 28
Image 28

4. Preparation for Surveying

4.1 Setting up the instrument

1Adjust the tripod legs so that a height suitable for surveying is obtained when the instrument is set on the tripod.

2A Set the tripod and fix the metal shoe firmly into the ground so that the tripod head is as level as possible and centered above the station point. If the tripod head is disturbed by the action of fixing the metal shoe into the ground, correct the level by extending or retracting each leg of the tripod.

3Set the instrument on the tripod head; insert the tripod center screw into the instrument bottom plate and tighten firmly.

Tripod head

Bottom plate

 

Center screw

Tripod

28

Page 28
Image 28
Pentax ETH-310, ETH-302, ETH-305 instruction manual Preparation for Surveying, Setting up the instrument