Regulatory Information
Polish Center for Testing and Certification Notice
The equipment should draw power from a socket with an attached protection circuit (a
The phasing conductor of the room's electrical installation should have a reserve
To completely switch off the equipment, the power supply cable must be removed from the power supply socket, which should be located near the equipment and easily accessible.
A protection mark "B" confirms that the equipment is in compliance with the protection usage requirements of standards
RETURN TO TOP OF THE PAGE
North Europe Information
file:///D/rita/LF2/LF2/LFa1/multi_manual/english/201B/SAFETY/regs/regulat.htm (7 of 11) [8/29/2001 3:12:03 PM]