SECTION 5:

Maintenance

!

WARNING:

 

Always disconnect power to the machine before perform- ing any maintenance. Failure to do this may result in serious personal injury.

Cleaning

Mantenance Schedule for Optimum Performance

NOTE: This schedule is for machines that are under daily use. Adjust accordingly for your level of use.

DAILY

Keep unpainted cast iron parts of table clean.

 

Lubricate feed rollers.

 

 

 

WEEKLY

Clean cutter head of all debris.

Lubricate all four columns.

 

 

 

 

Inspect V-belt tension, damage, and wear. NOTE: Should

 

be done after first 16 hours of use.

 

 

MONTHLY

Clean out the dust buildup from inside cabinet and off motor.

 

Lubricate worm gear.

 

Check and lubricate drive & table height adj. chains.

 

 

 

Change gear box oil. NOTE: First oil change should be

YEARLY

done after the first 20 hours of use, then yearly afterwards.

 

Replace with 80W-90W gear oil.

Keep excess wood chips and sawdust off of machine, and wipe off the remaining dust with a dry cloth to ensure moisture from wood dust does not remain on bare metal surfaces. To help prevent rusting and smooth material feed, treat all unpainted cast iron and steel with a non-staining lubricant after cleaning.

Lubrication

BEARINGS: This planer features factory-sealed bearings and requires no lubrication during its lifetime. Should a bearing fail, your planer will probably develop a noticeable rumble and or vibration, which will increase when the machine is put under load. Do not continue use of your planer until you have replaced the worn bearing as you may damage your planer. Bearings are standard sizes and can be replaced through local suppliers.

COLUMNS & LEAD SCREWS: The outside of the four columns should be lubricated weekly with SAE 30W oil. The four lead screws inside the columns should be lubricated with general purpose grease once a month.

TABLE HEIGHT ADJUSTMENT CHAIN: should be inspected monthly and lubricated with general purpose grease as needed.

WORM GEAR: The worm gear for changing the table height should be inspected monthly and lubricated with general purpose grease when needed. Remove the worm gear box to inspect. See parts diagram for location.

GEAR BOX: Gear box oil should be changed after the first 20 hours of operation. It is not necessary to remove the chain drive cover to access the fill/drain plugs, but doing so will give you easier access. Replace with 80W-90W gear oil. Inspect levels periodically and change yearly. Replace gear oil more frequently under heavy use. NOTE: Remove the cover and inspect the internal gears for wear. (Figure 36)

DRIVE CHAIN: The drive chain should be inspected and lubricated monthly. Check sprocket/gear, chain and cotter pin during inspection. Use a general purpose grease. Some chains will have master links instead of cotter pins.

Fill Plug

Drain

Figure 36

© 2006 Pioneer Supply International

23

Page 23
Image 23
Pioneer PNR 14-150 operation manual Section, Lubrication