Pitco Frialator installation instructions L80-029Rev 5 10/07

Models: L80-029

1 24
Download 24 pages 55.13 Kb
Page 8
Image 8
Manual background

e.Thread the compression nut on the corrugated tubing end of the SCBS Valve Assembly onto the orifice assembly that you inserted into the runner tube in step c and tighten with a 1/2” (13 mm) wrench.

f.Install the orifice retainer bracket onto the pilot bracket and SCBS Orifice assembly. This will secure the orifice assembly into the runner tube.

g.Tighten ALL joints on the SCBS Valve assembly with a ½” (13 mm) wrench. Reinstall the pilot tubing into the gas valve.

h.Reconnect the control harness to the main gas valve, and if you removed a Solid State Control earlier in this procedure you may re-install it at this time.

Follow this procedure to prepare and install the SCBS Control Board and Harnesses:

a.Using a phillips head screwdriver, remove the two screws that secure front panel and rotate the control assembly down. Disconnect the control harness and remove the front panel assembly from the appliance. (This will not be necessary if your model uses a solid- state control). Store the front panel assembly in a safe place to avoid damaging the control.

L80-029 Rev 5 10/07

6

Page 8
Image 8
Pitco Frialator installation instructions L80-029Rev 5 10/07