OPERATION
!WARNING
BEFORE OPERATING THE CONTROL PANEL - MAKE SURE THAT NO ONE IS INSIDE THE HOPPER OR NEAR THE SPINNER.
1. Electric Throttle Control Panel Switch functions
(Sequence of Operations)
CHOKE
ON HI
START
OFF
LO
CONV.
MOUNTING
TABS
RED LENSE
A. ON/OFF | System power activated (ready to start). Spreader engine is not running. | |
|
| Spreader conveyor is not engaged. |
B. START (Engine only) | ||
1 . On | On switch depressed. | |
2. | Choke | (cold engine ) Hold down for 5 seconds to move the throttle actuator to the |
|
| choke position. |
|
| Note: Choking a warm engine may not be necessary |
3. | Start | Hold down until engine starts. |
4. | LO / HI | Decreases / increases engine speed - adjust as engine warms up. Lo will |
|
| stop the choke function. |
C. TO ENGAGE Spreader Conveyor
1.Push CONV switch only after you are sure no one is in the hopper or near the spinner! This lights up the red indicator light, if light does not light, take care to verify that the light is not malfunctioning.
6