2.0Table of contents

Section

Page

1.0 Warranty and Service

2

2.0

Table of contents

3

3.0

Safety warnings

4

4.0

About this manual

5

5.0

Specifications

6

5.1

 

Base Hole Centers for PM2800B

7

6.0

Setup and assembly

8

6.1

 

Shipping contents

8

6.2

 

Tools required for setup:

8

6.3

 

Unpacking and cleanup

8

6.4

 

Assembly

8

6.5

 

Table insert leveling

10

7.0

Electrical connections

11

7.1

 

Grounding instructions

11

7.2

 

Voltage conversion

12

7.3

 

Extension cords

12

8.0

Adjustments

12

8.1

 

Table movement

12

8.2

 

Chuck and arbor removal

13

8.3

 

Changing spindle speeds

13

8.4

 

Depth stop

13

8.5

Work stop

13

8.6

 

Return spring

13

8.7

 

Laser adjustment

14

9.0

Operating controls

15

10.0

 

Operation

15

10.1

Installing bits

15

10.2

Positioning work piece

15

10.3

General Inspection

16

10.4

Setting rotation speed

16

11.0 Maintenance

16

11.1

Belt replacement

16

11.2 Lamp replacement

17

12.0

 

Troubleshooting the PM2800B Drill Press

18

13.0 Replacement Parts

18

13.1.1 Exploded View for PM2800B

19

13.1.2 Part List for PM2800B

20

14.0

 

Electrical Connections for PM2800B Drill Press

24

3

Page 3
Image 3
Powermatic PM2800B operating instructions Table of contents