Proline PLFW102 Island Hood Installation, Mark ceiling, Install support brackets, Install Chimney

Models: PLFW101 PLJW102 PLFW102 PLJW101

1 14
Download 14 pages 42.04 Kb
Page 9
Image 9
ISLAND HOOD INSTALLATION

12PROLINE RANGE HOODS

ISLAND HOOD INSTALLATION

STEP 1 Mark ceiling

place 4 marks on the ceiling, directly above the 4 corners of your cooktop

drawing on the ceiling, connect those 4 marks into a rectangular shape

this shape should be the same as the perimeter of your cooktop, and located on the ceiling directly above the cooktop

find the center point. This is where you will mount your ceiling bracket

STEP 2 Install ceiling bracket

*ceiling bracket must be mounted to a weight-bearing ceiling able to support at least twice the weight of the hood.*

center the bracket on the ceiling, directly above your cooktop (using your lines from step 1)

trace the outline of the ceiling bracket onto the ceiling

mark the 4 corners where you will drill holes

if you are venting to the outside of your home: cut out a hole in the ceiling and drop your rigid ductwork and electrical wiring though the hole

put chimney bracket against ceiling

drill holes into ceiling where marked, securing the ceiling bracket into place

STEP 3 Install support brackets

place brackets vertically along 4 cor- ners of the ceiling bracket

extend the brackets to the appropri- ate length. (the bottom of the hood should be 28”-36” above the cooktop)

screw all support brackets to the ceil- ing mounting bracket

USER MANUAL  13

ISLAND HOOD INSTALLATION

STEP 4 Install Chimney

slide inner chimney sleeve over support brackets, covering the ceiling bracket

screw into place at the top of ceiling bracket

slide outer chimney sleeve to the bottom portion of the chimney

adjust until the bottom chimney sleeve comes a few inches from the bottom of the support brack- ets

you may want to use painters tape to help hold the chimney in place while you proceed to step 5

STEP 5 Attach Hood

*first make sure your ductwork and electrical work are pulled through the ceiling and ready to go (see preparation work and step 2 above)

if your hood comes with a transition ducting piece, secure it to the base of your hood before mount- ing

place the base of the hood directly under the chimney

screw hood to the support brackets on all 4 cor- ners

feed electrical and ducting work through chimney

slide outer chimney sleeve down into place, meet- ing the top of the hood

STEP 6 Install Filters

if your hood will be ductless, install the charcoal filter (see filter information after the Control Panel diagram above)

peel off any protective tape or film on the metal filter

pop the spring loaded metal filter into place, di- rectly under the hood

That’s it! Now you’re ready to enjoy your new island hood!

Page 9
Image 9
Proline PLFW102, PLJW101 Island Hood Installation, Mark ceiling, Install support brackets, Install Chimney, Attach Hood