Quadra-Fire CASTILE-GAS-MBK 4Termination Locations, A. Vent Termination Minimum Clearances

Models: 7023-111E CASTILE-GAS-MBK CASTILE-GAS-PMH CASTILE-GAS-CSB

1 52
Download 52 pages 33.32 Kb
Page 8
Image 8
4Termination Locations

4Termination Locations

A. Vent Termination Minimum Clearances

A. Vent Termination Minimum Clearances WARNING

Fire Risk.

Explosion Risk.

Maintain vent clearance to combustibles as specifi ed.

• Do not pack air space with insulation or other materials.

Failure to keep insulation or other materials away from vent pipe may cause fi re.

Measure vertical clearances from this surface.

2FT.

MIN.

GAS DIRECT VENT

TERMINATION CAP

HORIZONTAL

OVERHANG

20 INCHES MIN.

VERTICAL

 

WALL

LOWEST

DISCHARGE

OPENING

X

12

Roof Pitch ROOF PITCH

IS X/ 12

H (MIN.) - MINIMUM HEIGHT FROM ROOF TO LOWEST DISCHARGE OPENING

Measure horizontal clearances from this surface. (See Figure 4.4 for specifi c clearances.)

Figure 4.1 Termination Clearances

GAS, WOOD OR FUEL

 

OIL TERMINATION

B

 

 

 

 

 

GAS

 

 

 

 

 

 

 

 

 

 

 

C

TERMINATION

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

H (Min.) FtA* 3 foot minimum in snow regions

 

Gas

Wood & Fuel Oil

Comments

 

Termination

Termination

 

 

 

 

 

 

A

6 in.

20 in. min.

Horizontal distance between terminations

 

 

 

 

B

20 in.

24 in. min.

Distance to perpendicular wall

 

 

 

 

C

18 in.

18 in.

Vertical distance between terminations

 

 

 

 

Figure 4.2 Multiple Vertical Termination

Roof Pitch

H (Min.) Ft

Flat to 6/12

1.0*

Over 6/12 to .......................................................7/12

1.25

Over 7/12 to 8/12

1.5*

Over 8/12 to 9/12

2.0*

Over 9/12 to 10/12

2.5*

Over 10/12 to 11/12

3.25

Over 11/12 to 12/12

4.0

Over 12/12 to 14/12

5.0

Over 14/12 to 16/12

6.0

Over 16/12 to 18/12

7.0

Over 18/12 to 20/12

7.5

Over 20/12 to 21/12

8.0

* 3 foot minimum in snow regions

Figure 4.3 Minimum Height from Roof to Lowest Discharge Opening

Figure 4.3 specifi es minimum vent heights for various pitched roofs.

Page 8

Quadra-Fire · Castile Gas Stove · 7023-111E

July 29, 2008

Page 8
Image 8
Quadra-Fire CASTILE-GAS-MBK 4Termination Locations, A. Vent Termination Minimum Clearances, Roof Pitch, H Min. Ft