Contents |
|
RECEIVING EQUIPMENT | 3 |
GENERAL SPECIFICATIONS | 3 |
INSTALLATION PROCEDURES | 4 |
Code Requirements | 4 |
Mounting Base | 4 |
Clearance Requirements | 4 |
Combustion/Ventilation Air | 4 |
Venting Connections | 5 |
Vent Damper Installation | 7 |
Gas Supply Connections | 11 |
Water Connections & System Piping | 11 |
Piping Diagrams | 12 |
Electrical Wiring | 15 |
Wiring Diagrams | 16 |
SERVICING PROCEDURES | 23 |
General Locations of Controls | 23 |
Sequence of Operation | 23 |
24 | |
26 | |
Safe Shutdown Test | 28 |
Inspection Schedule | 28 |
Repair Procedures | 29 |
TROUBLESHOOTING GUIDE | 31 |
Adjustments/Replacements of Components | 33 |
REPLACEMENT PARTS LIST | 34 |
CALIFORNIA PROPOSITION 65 WARNING: This product contains chemicals known to the State of California to cause cancer, birth defects or other reproductive harm.
These instructions are provided to assure the proper installation and operation of Raypak boilers. Should questions arise regarding the specifications, installation, operation or servicing of these boilers, we suggest that the local Sales representative or the factory be consulted.
2