Reebok Fitness RBTL76009.0 manual Patch Bolts yet

Models: RBTL76009.0

1 32
Download 32 pages 57.4 Kb
Page 9
Image 9

5.With the help of a second person, carefully tip the treadmill onto its right side. Partially fold the Frame (55) so that the treadmill is more stable; do not fully fold the Frame yet.

Attach a Wheel (96) to the Base (95) with a 3/8" x 2" Bolt (8) and a 3/8" Nut (10). Do not over- tighten the Nut; the Wheel must turn freely.

Press a Base Cap (89) into the Base (95).

6.Hold a Bolt Spacer (14) inside the lower end of the Left Upright (84). Insert a 3/8" x 4" Patch Bolt (7) with a 3/8" Star Washer (11) into the Left Upright and the Bolt Spacer. Repeat this step with a second Bolt Spacer (14), 3/8" x 4" Patch Bolt (7), and 3/8" Star Washer (11). Hold the Left Upright Spacer (88) and the Left Upright (84) against the Base (95). See inset drawings B and C in step 3. Make sure that the Left Upright Spacer sits flush against the Base. If necessary, turn the Left Upright Spacer and try again. Tighten the 3/8" x 4" Patch Bolts (7) until the heads of the Patch Bolts touch the Upright; do not fully tighten the

Patch Bolts yet.

With the help of a second person, tip the tread- mill so that the Base (95) is flat on the floor.

5

 

 

 

89

 

8

 

 

 

55

 

 

 

 

95

96 10

 

 

 

 

6

84

7

11

88

 

14

95

 

9

Page 9
Image 9
Reebok Fitness RBTL76009.0 manual Patch Bolts yet