Regency U35-LP1, U35-NG1 The Kensington Front Installation, PanelDoor Installation

Models: U35-NG1 U35-LP1

1 32
Download 32 pages 26.72 Kb
Page 15
Image 15
2-Panel Door Installation:

INSTALLATION

THE KENSINGTON FRONT INSTALLATION

2-Panel Door Installation:

3-Panel Door Installation:

1)Install the Sub-Frame by hooking the top flange onto the top of the Glass Door and swing the Sub-Frame towards the unit. Pull out the hooks which already secure the Glass Door and place them thru the holes in the bottom of the Sub-Frame to secure both the Glass Door and Sub-Frame in place together.

1)Install the Sub-Frame by hooking the top flange onto the top of the Glass Door and swing the Sub-Frame towards the unit. Pull out the hooks which already secure the Glass Door and place them thru the holes in the bottom of the Sub-Frame to secure both the Glass Door and Sub-Frame in place together.

Glass Door

Sub-Frame

Sub-Frame

Hook

2)Mount the 2-panel Door Frame to the flange on Sub-Frame, ensuring to line up holes. Secure using the 6 screws provided.

3)Hook the Left Side Screen Door to the Door Frame by placing the door hinges (top & bottom) over the pins on the Door Frame. Repeat for Right Side Screen Door.

Note: It will be easier to put the Screen Door in place by starting with the bottom hinge.

Left Side Door 3-Panel Door Installation:

Pin on Door Frame

Note: If you find that the Left or Right Side Screen Door is lower then the other, use the spacer provided to help align the Doors.

The spacer is to be placed over the bottom pin before installing the Screen Door.

Glass Door

Sub-Frame

Sub-Frame

Hook Glass Door

2)Mount the 3-panel Screen Door / Frame Assembly to the flange on Sub-Frame, ensuring to line-up holes. Secure using the 4 screws provided.

U35 FPI Direct Vent Gas Insert

15

 

Page 15
Image 15
Regency U35-LP1, U35-NG1 The Kensington Front Installation, PanelDoor Installation, Glass Door Sub-Frame Sub-Frame Hook