Flue Manifold Installation
4.Install the Terminal
Terminal seal
Check that the terminal seal is in place. For weatherboard walls, add the second seal next to the terminal seal to compensate for weather board angle.
From the outside insert the terminal into the sleeve with the marking “TOP” at the top.
The left hand side locking tie should beTerminal marked “LEFT”.
| Locking tie |
|
|
|
|
|
|
|
| ||
|
|
|
|
|
|
|
|
| |||
|
|
|
|
|
|
|
|
| |||
|
|
|
|
|
|
|
|
| |||
|
|
|
|
|
|
|
|
| |||
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
6. Lock the ties |
|
|
|
|
|
|
|
|
|
|
|
Pulling hard on the left and right hand ties, | Locking ties | ||||||||||
clip the ties over the notches inside the |
|
|
|
| Sleeve | ||||||
sleeve. You should be able to pull the ties 2 |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
| |
or 3 notches past the starting point. Cut the |
|
|
|
|
|
|
|
|
|
|
|
ties, leaving about 3/4 inch (20 mm) past the |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
| |
notch. Bend the ties back into the sleeve and |
|
|
|
|
|
|
|
|
|
|
|
parallel to the wall. |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
| |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
7.Insert Inside Connection Assembly
Push the assembly into the terminal tube, ensuring that the seal is in place on the inner tube.
Attach the inside connection with 3 screws. The inner connection can still be turned to install the screws.
3 screws
22 | Rinnai Corporation ES38 Manual |