ROBERTS GORDON®
HEATER INSTALLATION
Critical Hanger Placement
Typical Suspension Details
Beam Clamp
Anchor
Screw Hook (3/8")
|
| Chain size |
| Rod (3/8") | 3/16" minimum |
|
| |
24" min. |
|
|
(61 cm) | "X" (see table) |
|
| Turnbuckle | |
|
|
“S” Hook
Locknut (Typical)
Concrete Beam
Wood Beam
Locknut
Washers
7'6" (2.3 m)
|
|
| Turnbuckle |
|
|
|
| Hanger |
|
|
|
| Reflector |
|
| Side View | Towards Pump | Front View | |
Description | Part Number | Run Length | Typical Expansion | Minimum “X” Length |
Turnbuckle | 91903201 | 50' (15 m) | ±1" (3 cm) | 12" (30 cm) |
91907302 | 100' (31 m) | ±2" (5 cm) | 24" (61 cm) | |
Tube/Reflector Hanger | 03090100 | 150' (46 m) | ±3" (8 cm) | 36" (91 cm) |
|
| 200' (61 m) | ±4" (10 cm) | 46" (122 cm) |
|
| 250' (76 m) | ±5" (13 cm) | 57" (145 cm) |
© 2004
APPLICATION S, ENGI NEERING AND DETAI LED GUID ANCE ON SYSTEMS DESIGN, INSTALLATI ON AND PRODUCT PERFORMANCE IS AVAI LABLE UPON REQUEST. ROBERTS GORDON® PRODUCTS ARE TO BE INSTALLED ONLY IN ACCORDANCE WI TH LOCAL LAWS, CODES AND REGULATIONS, AND ONLY BY A CONTRACTOR QUALI FIED I N THE I NSTALLATION AND SERVICE OF