5.1.3 Air Flow And Temperature Rise Ranges
Model | Rate | Air Flow | Temperature Rise | ||
| (Btu/h) | Minimum (CFM) | Maximum (CFM) | Minimum (°F) | Maximum (°F) |
UHD[X][S][R] 150 | 150,000 | 1,360 | 5,800 | 20 | 83 |
UHD[X][S][R] 175 | 175,000 | 1,400 | 6,850 | 20 | 95 |
UHD[X][S][R] 200 | 200,000 | 2,050 | 7,750 | 20 | 73 |
UHD[X][S][R] 225 | 225,000 | 2,100 | 8,300 | 20 | 80 |
UHD[X][S][R] 250 | 250,000 | 2,350 | 8,850 | 22 | 80 |
UHD[X][S][R] 300 | 300,000 | 2,700 | 10,200 | 23 | 86 |
UHD[X][S][R] 350 | 350,000 | 3,120 | 13,600 | 22 | 86 |
UHD[X][S][R] 400 | 385,000 | 3,420 | 14,200 | 22 | 86 |
5.2 Suspension
WARNING
Crush Hazard
Use 3/8" threaded rod minimum.
Failure to follow these instructions can result in death, injury or property damage.
When handling or supporting the heater from below, ensure that the weight is taken at the support points. For typical suspension, See Page 8, Figure 3.
The gas or electrical supply lines must not be used to support the heater.
Do not locate the gas or electrical supply lines directly over the path of the flue products from the heater.
The heater must be installed in a location that is readily accesible for servicing.
Four suspension points (3/8" nuts) are located on the top of the heater. Drop rods must be 3/8" diameter mild steel.
Figure 3: Suspension Methods
The heater must be installed in accordance with clearances to combustibles as indicated on the wall tag and in this manual.
NOTE: Duct supports not shown. Duct supports and duct are not provided by manufacturer.
|
|
| Ensure all suspension |
|
|
| hardware is torqued to |
Unistrut |
| a minimum of 20 ft lbs. | |
|
| Channel Nut | |
|
|
|
|
Washer
Nut
3/8" Threaded Rod
Cone Point
Set Pin
Window
Clamp
3/8" |
|
| Unistrut | |
| Threaded |
| ||
| ||||
| Rod |
|
| |
| Nut |
|
| |
Washer |
|
| ||
| Riv |
|
|
|
| Nut |
|
| Support Points |
| ||||
|
|
|
|