UHD STANDARD DUCT FURNACE INSTALLATION OPERATION AND SERVICE MANUAL
Figure 11: Automatic Burner Control Sequence
Burner Sequence for Ignition Control
START
Thermostat 24 V
RUN
SHUT DOWN
Flue Blower
Pressure |
|
Switch | C |
|
Ignition Spark
Start Gas Valve
Flame Signal
P
30 Seconds Purge* | 30 Seconds Post Purge |
NO |
|
NC | ts = 10 Seconds |
|
*Purge time begins at pressure switch change over.
Required Incoming Signals
If at any stage the flame fails, the control will retry
Signals Output By Control
Figure 12: Gas Valve
for ignition. The control has four trials for ignition before a one hour lockout.
END VIEW | TOP VIEW |
|
| Regulator |
|
| ½PSI |
|
| C |
|
| IN |
|
|
| ON |
Gas Inlet | OFF | Outlet |
| ||
| Pressure | |
|
| |
| Description | Part Number |
| Gas Valve 150 - 225 NG | 90032505 |
| Gas Valve 150 - 225 LP | 90032506 |
| Gas Valve 250 - 400 NG | 90032520 |
Inlet Pressure | Gas Valve 250 - 400 LP | 90032521 |
|
| |
22 |
|
|