7—Project and Drive Operations

Roland VS-2480 Owner’s Manual www.rolandus.com 95

Project Operations

About F6 (MARK)

Before you can perform some of the project operations, you have to
target the project on which you want to perform the operation. You do
this by marking the project.

Marking a Project

1. Press

or

or turn the TIME/VALUE dial to select the project.
2. Press F6 (MARK) to place a checkmark to the left of the project’s name, thus
targeting it.

SELECT

Press SELECT to load the project that’s currently selected in the project
list. When it’s loaded, it replaces the project that’s currently stored in
the VS-2480’s onboard memory. You can play, record, edit and mix a
project only while it’s loaded into the VS-2480.
To load a project from another drive, select the drive and press F6 (LIST), as described
in “To Display the Projects on a Drive” on Page 94.

Loading a Project

1. Press PROJECT.
2. If “SELECT” isn’t visible above F1, press PAGE until it is.
3. In the project list, select the project you want to load.
4. Press F1 (SELECT). The VS-2480 displays:
5. Press ENTER/YES to load the selected project, or EXIT/NO to cancel the operation.
If you pressed ENTER/YES, the VS-2480 asks:
6. Press ENTER/YES to store your latest changes to the currently loaded project
before loading the new one, or EXIT/NO to skip re-saving it.
The VS-2480 loads the selected project into its memory.
F6 (MARK) is available only when a project, not a drive, is selected.
The SELECT button doesn’t look quite like any other VS-2480 menu button, and it acts
differently, too. It’s the only button that performs its action as soon as you press it. All
of the other buttons merely display the corresponding operation’s screens.
If the currently loaded project is write-protected (Page 99), the VS-2480 loads the new
project without displaying this question.
PROJECT menu
F6 (MARK)
PROJECT menu
F1 (SELECT)
VS2480OMUS.book 95 ページ 2006年2月7日 火曜日 午後4時16分