SELECTION OF INSTALLATION PLACE / ELECTRICAL WORK
ELECTRICAL WORK
The electrical work should be performed by a specialist qualified for the work.
◆Use the three phase power supply, and be sure to install the sub power distributing board for exclusive use with the unit(separately purchased by the user).
❈Avoid
◆Be sure to install circuit breaker (separately purchased by the user).
◆Be sure to connect the grounding wire.
❏Electric power spec
Power | 3phase 3wires 208 ~ 230V / 60Hz | ||
|
|
| |
Ampere of breaker | 50 A | ||
|
|
| |
Knife switch | Switch | 30 A | |
|
|
| |
| Fuse | 30 A | |
|
|
| |
Size of grounding wire | AWG 14 | ||
|
|
| |
Min. size of electric wires from/to | AWG 19 | ||
the indoor/outdoor unit | |||
| |||
|
|
| |
Size of electric input wires | AWG 19 | ||
|
|
|
CAUTION
◆Be sure to use the wires, and switches or fuses of power distribution board are qualified and fulfill the specification.
◆Be sure to install knife switch or circuit breaker on the power distribution board.
◆The electrical and grounding work should be performed as per “ technical specification of electrical facilities ” and “ specification of internal wiring ”.
◆Be sure to connect main electrical input wires with bolted connectors using compressed terminal.