Samsung AQV09J installation manual Fixing the Indoor Unit in Place, English

Models: AQV09J

1 18
Download 18 pages 30.06 Kb
Page 15
Image 15
Fixing the Indoor Unit in Place

COMPLETING THE INSTALLATION

Fixing the Indoor Unit in Place

ENGLISH

After checking for gas leaks in the system, insulate the pipe, hose and cables. Then place the indoor unit on the installation plate.

1To avoid condensation problems, place heat-resistant polyethylene foam separately around each refrigerant pipe in the lower part of the indoor unit.

2Wrap the refrigerant pipe and the drain hose in the rear of the indoor unit with the absorbent pad.

Wind the pipe and hose three times to the end of the indoor unit with the absorbent pad. (0.79 inch(20mm) interval)

3Wind the pipe, assembly cable and drain hose with insulation tape.

4Place the bundle (the pipe, assembly cable and drain hose) in the lower part of the indoor unit carefully so it doesn’t project from the rear of the indoor unit.

5Hook the indoor unit to the installation plate and move the unit to the right and left until it is securely in place.

6Wrap the rest of the pipe with vinyl tape.

7Attach the pipe to the wall using clamps (optional).

Installation plate Manual backgroundManual backgroundManual background

E-15

Page 15
Image 15
Samsung AQV09J installation manual Fixing the Indoor Unit in Place, English