COMPLETING THE INSTALLATION
Fixing the Outdoor Unit in Place
“ X ”
“ Y ” |
|
|
| Rubber leg |
|
Model | “X” | “Y” |
AQV09J 1.77ft(538mm) 0.95ft(290mm) AQV12J
AQV18J 2.17ft(660mm) 1.12ft(340mm) AQV24J
Install the outdoor unit to a stable base to avoid the generation of noise and vibration, especially when installing the unit close to a neighbor.
If you install the outdoor unit in a place exposed to strong winds or at a height, fix it to an appropriate support (wall or ground).
1Place the outdoor unit as indicated on the top of the unit to let the discharged air out properly.
2Fix the outdoor unit to an appropriate support using anchor bolts.
3If the outdoor unit is exposed to strong winds, install shield plates around the outdoor unit so that the fan can operate correctly.
Secure the rubber leg to prevent the generation of noise and vibration.
Final Check and Trial Operation
To complete the installation, perform the following checks and tests to ensure that the air conditioner operates correctly.
1 Check the following:
Strength of the installation site
Tightness of pipe connection to detect gas leak Electric wiring connection
Drainage
Grounding conductor connection
Correct operation (follow the steps below)
2 Press the button and check the following:
The indicator on the indoor unit lights up.
The airflow blade opens and the fan gears up for operation.
3 Press any button and check the following:
The appropriate indicator lights up and the air conditioner operates according to the selected mode or function.
4Press the button and check the following:
The airflow blades work properly.