Samsung LH48RMDWLGU/UE, LH43DCJPLGC/EN, LH40RMDPLGU/EN manual Managing schedules, Schedule settings

Models: LH48RMDWLGU/UE LH40RMDWLGU/UE LH40RMDPLGU/EN LH43DCJPLGC/EN

1 31
Download 31 pages 23.26 Kb
Page 18
Image 18

Using Content Creator

Managing schedules

Configure and manage schedules to play content on Samsung display devices at specific times. Set the same schedule to play on specified days of the week or set different schedules to play by day of the week.

Open the schedule settings page using one of the following options:

Option 1  Click Schedule Content from the main page.

Option 2  Click Schedule from the edit template page.

<< Note

If the schedule settings page is displayed using option 2, a template being edited can be saved and automatically applied to a new schedule. For a schedule with a template applied, time settings are automatically configured. Start and end times can be changed using the schedule settings page, if required. For further details, refer to the following:  ► Changing schedule time settings

Schedule settings page

1 2 3 4

5

6

7 8

9

18

Page 18
Image 18
Samsung LH48RMDWLGU/UE, LH43DCJPLGC/EN, LH40RMDPLGU/EN, LH40RMDWLGU/UE manual Managing schedules, Schedule settings