18
Installation procedures
With the site requirements completed, the enclosure designed, and the drive unpacked, you are ready to begin the installation. The following procedures are included in drive installation:
•Setting the control board jumpers
•Installing the power supply
•Attaching an optional bezel
•Mounting the drive
•Connecting the system I/O cabling
•Grounding the system
•Synchronizing the spindle
Setting the control board jumpers
Caution. Do not remove the control board to set jumpers.
The control board on the drive contains a number of jumpers that must be set correctly for normal operation of the drive. Figure 7 identifies jumpers, gives their locations on the control board, and lists the possible settings for normal drive operation.