18

Installation procedures

With the site requirements completed, the enclosure designed, and the drive unpacked, you are ready to begin the installation. The following procedures are included in drive installation:

Setting the control board jumpers

Installing the power supply

Attaching an optional bezel

Mounting the drive

Connecting the system I/O cabling

Grounding the system

Synchronizing the spindle

Setting the control board jumpers

Caution. Do not remove the control board to set jumpers.

The control board on the drive contains a number of jumpers that must be set correctly for normal operation of the drive. Figure 7 identifies jumpers, gives their locations on the control board, and lists the possible settings for normal drive operation.

Page 23
Image 23
Seagate ST43400N/ND user manual Installation procedures, Setting the control board jumpers