![](/images/new-backgrounds/1101850/10185015x1.webp)
EMo ,Y
TO INSTALL THE UPPER HANDLE AND CRANK ASSEMBLY
oOn the right side of the handle, install and secure the
following parts (found in parts bag) in the lower handle hole as shown in figure 4A:
1 - 3/8" x 2" bolt
2 - 3/8" flat washers & 1 - 3/8" split lockwasher 1 ° 3/8" nut
IRemove the 3/8" nylon Iocknut and flatwasher from tl_e "eye" bolt assembly (on the chute crank assem- bly) and adjust the remaining 3/8" nut and flatwasher on the "eye" bolt about half way up the thread..
oInstall "eye" bolt through lower hole on the left hand side of the handle.
0Install the 3/8" flatwasher and the 3/8" nylon locknut loosely on the "eye" bolt, as shown°
qll Remove the plastic cap, the cotter pin and the washer from the wormed end of the crank assembly and set aside (See Fig. 5).
•Rotate the notched section of the discharge chute toward the
•Install the wormed end of the crank through the hole in the adjusting rod and secure the end with the flat washer and cotter pin, as shown in Fig. 5o
•Bendtheendsofthecotterpinaroundtherod andre- install the plastic cap°
•Tighten the eye bolt installed earlier, keep eye in line with the rod while tightening the inside nut securely,
•Tighten the outside 3/8" jam nut up against the other 3/8" jam nut (See Fig.. 4B).
•Rotate the chute crank fully c!ockwise and fully
NOTE: Be sure the crank does not touch the side of the engine or'the cover will be scratched.
PJGHT HANDLE
| ADJUST NUTS | TO MOVE |
LEFT HANDLE | EYE BOLT IN | OR OUT |
TIGHTEN _/8" JAM
NUT UP AGAINST
OTHER 3/_," JAM NUT
EYE BOLT
FIG. 4B
J ii iiii / .... , ,,,lllUiiiJi iJi1,11,,i,ii iiiiii i iii /,,
PLASTIC | _ | NOTCHED SECTION |
CAP | COTTER | ,,b |
| ||
| INCH | CLEARANC |
FLATWASHER
CRANK ADJUSTING ROD
1/2 INCH
WORM
FIG. 5