ASSEMBLY

•• To watch an assembly video, go to http://productvideo.co/ assembly/nordictrack or use your mobile phone or smartphone to read the QR code at the right.

•• Left parts are marked ““L”” or ““Left”” and right parts are marked ““R”” or ““Right.””

•• To identify small parts, see page 5.

•• In addition to the included tool(s), assembly requires the following tools:

•• Assembly requires two persons.

•• Place all parts in a cleared area and remove the packing materials. Do not dispose of the packing materials until you nish all assembly steps.

one Phillips screwdriver

one adjustable wrench

Assembly may be easier if you have a set of wrenches. To avoid damaging parts, do not use power tools.

1.Set a sturdy piece of packing material under the front of the Frame (1). Have a second person hold the Frame to prevent it from tipping while you complete this step.

Identify the Front Stabilizer (2). Note: The Front Stabilizer has wheels; the Rear Stabilizer (not shown) does not have wheels.

Attach the Front Stabilizer (2) to the Frame (1) with two M10 x 95mm Screws (62).

Remove the packing material.

2.Set a sturdy piece of packing material under the rear of the Frame (1). Have a second person hold the Frame to prevent it from tipping while you complete this step.

Orient the Rear Stabilizer (3) so that the welded tubes are facing away from the Frame (1).

Attach the Rear Stabilizer (3) to the Frame (1) with two M10 x 95mm Screws (62).

Remove the packing material.

1

Wheel

62

2

1

2

3

1

62Welded

Tubes

6

Page 6
Image 6
Sears NTEX03912.0 user manual Assembly