6 . EXPLANATION OF TEST AND DATA DISPLAY

By operating the switch unit, periodically perform the tests and data check. When installing the machine initially or collecting cash, or when the machine does not function correctly, perform checking in accordance with the explanations given in this section. The following shows tests and modes that should be utilized as applicable.

CAUTIONS TO BE HEEDED WHEN USING THE TEST MODE:

In the case where plural machines are linked for communication play, if even one seat enters the test mode, all of the linked seats will enter the test mode. Therefore, if any one of the linked machines is in play, use care so as not to use the test mode.

The contents of the setting changes made will not be effective unless the test mode is finished in the test mode. When the setting is changed, be sure to “EXIT” in the menu mode. Do not press the TEST BUTTON during network check at the time of turning the power on or exiting from the test mode. If anyone of the linked machines uses the test mode during network check, all other Seats will continue network checking. Cause all of the Seats to reenter the test mode and then have all of the Seats exit from the test mode simultaneously.

When performing installation, servicing product or changing game boards refer to individual kit instructions for each of the listed items below:

ITEMS

DESCRIPTION

 

 

 

When the machine is installed, perform the following:

INSTALLATION

1. Check to see that each setting is as per standard setting made

OF MACHINE

at the time of shipment.

 

2. In the INPUT TEST mode, check each SW and VR.

 

3. In the OUTPUT TEST mode, check each of lamps.

 

4. In the MEMORY TEST mode, check ICs on the IC Board.

 

 

MEMORY

Choose MEMORY TEST in the MENU mode to allow the

MEMORY test to be performed. In this test, PROGRAM

 

 

RAMs, ROMs, and ICs on the IC Board are checked.

 

 

PERIODIC

Periodically perform the following:

SERVICING

1. MEMORY TEST

 

2. Ascertain each setting.

 

3. In the INPUT TEST mode, test the CONTROL device

 

4. In the OUTPUT TEST mode, check each of lamps.

 

 

CONTROL

1. In the INPUT TEST mode, check each SW and VR.

SYSTEM

2. Adjust or replace each SW and VR.

 

3. If the problem can not be solved yet, check the CONTROL’s moves.

 

 

MONITOR

In the MONITOR ADJUSTMENT mode, check to see if the

 

MONITOR adjustment is appropriately made.

 

 

IC BOARD

1. MEMORY TEST

 

2. In the SOUND TEST mode, check the sound related ROMs.

 

 

DATA CHECK

Check such data as game play time and histogram to adjust the

 

difficulty level, etc

 

 

13

Page 16