Sega Zombie Revenge Periodic Inspection Table, Coin Chute Tower, Interior, Power Supply Plug

Models: Zombie Revenge

1 49
Download 49 pages 15.81 Kb
Page 31
Image 31

10. PERIODIC INSPECTION TABLE

The items listed below require periodic check and maintenance to retain the performance of this machine and ensure safe operation.

Be sure to check once a year to see if Power Cords are damaged, the plug is securley inserted, dust is accumulated between the Socket Outlet and the Power Plug, etc. Using the product with dust as is accumulated can cause a fire or electrical shock.

Periodically once a year, request the place of contact herin stated or the Distrib- uter, etc. where the product was purchased from, as regards to the interior

cleaning. Using the product with dust as is accumulated in the interior without cleaning can cause a fire or short circuit accident. Note that cleaning the interior parts can be performed on a pay-basis.

 

 

 

Item

Interval

 

CABINET

 

Check Adjuster’s contact with surface.

Daily

 

MONITOR

 

Check Adjustments.

Monthly

 

 

 

 

 

 

 

 

Cleaning of CRT surfaces.

Weekly

 

 

 

 

 

 

COIN CHUTE TOWER

 

Check COIN SW.

Monthly

 

 

 

 

 

 

 

 

Coin insertion test.

Monthly

 

 

 

 

 

 

 

 

Cleaining the COIN SELECTOR

Monthly

 

 

 

 

 

 

Cabinet surfaces

 

Cleaning

As necessary

 

 

 

 

 

 

INTERIOR

 

Cleaning

Annually

 

 

 

 

 

 

POWER SUPPLY PLUG

 

Inspection and cleaing

Annually

 

 

 

 

 

 

 

 

 

 

CLEANING CABINET SURFACES

 

 

 

 

 

 

 

If the cabinet is badly stained, use a cloth which is dipped in the chemical detergent liquid diluted with water and then squezzed dry. Do not use thinner, benzine, alcohol or chemical dustcloth as these can damage Cabinet surfaces.

28

Page 31
Image 31
Sega Zombie Revenge Periodic Inspection Table, Coin Chute Tower, Interior, Power Supply Plug, Cleaning Cabinet Surfaces