Structuring and controlling the conference system

Large conference system with simple cabling

For setting up a large conference system with the maximum number of conference units (i.e. up to 400), you require one ADN CU1 central unit for controlling the conference and additional ADN PS power supplies for powering the conference units. The conference units are interconnected in cable strings and up to four cable strings can be connected to each ADN PS power supply.

ADN CU1

PORT I/II

ADN PS(max. 15)

PORT

I

1

 

 

 

 

2

PORT

I

 

PORT

PORT

II

II

2

 

1

 

max. 70

ADN D1/ADN C1

ADN CU1

ADN PS

max. 80 m

max. 80 m

 

 

52.8 V

1

2

3

... 20

 

approx. 2-5 m

approx. 2-5 m

 

 

 

 

 

 

>35 V

6 ADN PS