Servis-Rhino 2160 Connecting Attaching Heads To The Boom, Pre-Operation Inspection And Service

Models: 2160

1 204
Download 204 pages 37.88 Kb
Page 120
Image 120
6.CONNECTING ATTACHING HEADS TO THE BOOM
(S3PT-11)
(SG-13)
(SG-23)

OPERATION

OPERATION

Never run the Tractor engine in a closed building or without adequate ventilation. The exhaust fumes can be hazardous to your health.

Start tractor only when properly seated in the Tractor seat. Starting a tractor in gear can result in injury or death. Read the Tractor operators manual for proper starting instructions.

6.CONNECTING ATTACHING HEADS TO THE BOOM

1.Start by using a hoist to lower the boom down to the head. Align the Boom with the Head Hitch Post, insert the upper hitch pin through the Dipper end of the boom and the Head Upper Hitch Post. Attach with washer, nut, and cotter pin.

2.Then align the lower linkage of the Boom and insert the lower hitch pin through hitch post. Attach with nut and bolt.

3.Finally make sure all bolts, nuts, and pins are tightened to recommended torque. OPS-B- 0004_H

7.PRE-OPERATION INSPECTION AND SERVICE

Before each use, a pre-operation inspection and service of the implement and tractor must be performed. This includes routine maintenance and scheduled lubrication, inspecting that all safety devices are equipped and functional, and performing needed repairs. DO NOT operate the unit if the pre-operation inspection reveals any condition affecting safe operation. Perform repairs and replacement of damaged and missing parts as soon as noticed. By performing a thorough pre-operation inspection and service, valuable down time and repair cost can be avoided. OPS-U-0029

Always disconnect the main PTO Driveline from the Tractor before performing service on the Implement. Never work on the Implement with the tractor PTO driveline connected and running. Rotating Parts, Blades or Drivelines could turn without warning and cause immediate entanglement, injury or death.

2160 06/11

Operation Section 4-10

© 2011 Alamo Group Inc.

Page 120
Image 120
Servis-Rhino 2160 manual Connecting Attaching Heads To The Boom, Pre-Operation Inspection And Service