Sharp SGH-T519 manual Samsung Proprietary-Contents may change without notice

Models: SGH-T519

1 83
Download 83 pages 9.99 Kb
Page 18
Image 18

Test Command & Test Procedure

- 8PSK

1) Procedure:

a. Calibraion equipment HP8960 and the cell phone are connected through RF cable.

b. Target power ( required power level according to the specification which should be set by calibration program) is set to equipment as power level (ex: GSM 8 level is 27 dBm).

c. Activate phone in Cont_8psk_Tx_Mode_Only.

d. HP8960 equipment measures transmitted power through rf test cable from the phone and reports measured level to calibration program.

e. The program compares measured power with the target power. f. The calibration program decides power code which is defined in

advance in the program and writes the codes to the flash memory in the phone.

2) Target value is defined according to the value of EGPRS specification.

6-3

SAMSUNG Proprietary-Contents may change without notice

This Document can not be used without Samsung's authorization

Page 18
Image 18
Sharp SGH-T519 manual Samsung Proprietary-Contents may change without notice