english

2.2Procedure

Steps in Installation

Installing the CP 343-1 involves the following steps.

SPlug in the CP 343-1 and secure it with the screws (make sure that the bus connector between the CPU/IM and CP 343-1 is present).

SAttach the CP 343-1 to Industrial Ethernet as illustrated in Section 2.3.

SConnect a 24 V power supply.

Note

Make sure that you use the same voltage source as for the CPU or IM 361.

Note

The two front panels must be kept closed during operation. The module must be installed so that its upper and lower ventilation slits are not covered, allowing adequate ventilation.

Configuration

To initialize the CP 343-1 for communication services, use the configuration tool NCM S7 for Industrial Ethernet.

PG/PC Connection

You can connect the programming device when configuring the CP as follows:

Svia MPI

Svia Industrial Ethernet

If you configure the module via Industrial Ethernet, the CP 343-1 must already have a MAC address, in other words the hardware configura- tion of the CP 343-1 must already have been downloaded via the MPI interface (for details of node initialization, see /8/).

12Product information CP 343–1

C79000–Z8964–C038–05

Page 14
Image 14
Siemens CP 343-1 manual Procedure, Steps in Installation, PG/PC Connection