Silvercrest SEKU 2000 A16 Assembly, Gb Ie, ‹Place the floor plate 7 on the floor

Models: SEKU 2000 A16

1 19
Download 19 pages 21.27 Kb
Page 13
Image 13
‹Place the floor plate 7 on the floor.

GB

IE

Assembly

Step 5

‹Place the floor plate 7 on the floor.

‹Now take the previously assembled unit and carefully place it on the floor plate as shown in the following diagramme.

‹Then screw together the assembled unit with the connection blocks G on the floor plate 7 . For this, use 8 screws of the type A . (2 screws per connection block).

G

G

Manual background A Manual backgroundManual background

Manual background A

Step 6

‹Take the top covering panel 3 and place it on the preassembled unit.

‹Secure the top covering panel 3 from the inner side of the unit with 7 screws of the type A .

3

Manual background A Manual background

12

SEKU 2000 A1

 

Page 13
Image 13
Silvercrest SEKU 2000 A16 operating instructions Assembly, Gb Ie, ‹Place the floor plate 7 on the floor