SMC Networks SMC8126PL2-F Equipment Checklist, Package Contents, Optional Rack-MountingEquipment

Models: SMC8126PL2-F

1 68
Download 68 pages 7.61 Kb
Page 34
Image 34
RJ-45 Connector

3 Installing the Switch

RJ-45 Connector

Figure 3-1 RJ-45 Connections

Equipment Checklist

After unpacking the switch, check the contents to be sure you have received all the components. Then, before beginning the installation, be sure you have all other necessary installation equipment.

Package Contents

TigerSwitch 10/100/1000, SMC8126PL2-F

Four adhesive foot pads

Bracket Mounting Kit containing two brackets and eight screws for attaching the brackets to the switch

Power cord—either US, Continental Europe or UK

Console cable (RJ-45 to DB-9)

This Installation Guide

Management Guide CD

Optional Rack-Mounting Equipment

If you plan to rack-mount the switches, be sure to have the following equipment available:

Four mounting screws for each device you plan to install in a rack—these are not included

A screwdriver (Phillips or flathead, depending on the type of screws used)

3-2

Page 34
Image 34
SMC Networks SMC8126PL2-F manual Equipment Checklist, Package Contents, Optional Rack-MountingEquipment