SERIES 28A BOILER INSTALLATION AND OPERATION INSTRUCTIONS | Page 15 |
Figure 15 - Relief & Safely Valve Piping
WATER BOILER PIPING
The supply and return connections should be sized to suit the system, see Figures 13, 14, 16, 17 and Tables 5 & 6. Do not pipe the supply from the bottom port or the return to the top port, the boiler will not work properly. Typical water boiler piping arrangements are shown in Figures 18 & 19. Swing joints should be used.
Install 3" nipples into the two 3" NPT tappings in the front section and cap them.
NOTE: See CLEANING OF WATER BOILERS on page 18 before proceeding!
Supply Piping
Install a reducing bushing in the 6" NPT tapping in the front section to obtain the correct supply pipe size, Figure 13 and Tables 5 & 6.
Table 6 - Water Boiler Piping |
| |
Boiler Size | Return Size | Supply Size |
# Sections | NPT | NPT |
4 & 5 | 3 | 3 |
6 through 9 | 4 | 4 |
10 through 18 | 5 | 5 |
Note: Sizes based on 20° F, 11.1° C, ∆ T for the system.
Return Piping 4 Through 9 Section Boilers
Install 3" x 4" NPT bushings in the two 4" NPT tappings at the bottom of the back section. Install the two 3" NPT x 6" nipples per Figure 16. Assemble the rest of the return yoke as shown in Figure 16.
Table 7 - Boiler Water Content |
|
| ||
Boiler Model | Water Boilers | Steam Boilers | ||
| Gallons | Liters | Gallons | Liters |
123 | 466 | 104 | 394 | |
150 | 568 | 126 | 477 | |
177 | 670 | 148 | 560 | |
204 | 772 | 170 | 644 | |
231 | 875 | 192 | 727 | |
258 | 977 | 214 | 810 | |
285 | 1079 | 236 | 893 | |
312 | 1181 | 258 | 977 | |
339 | 1283 | 280 | 1060 | |
366 | 1386 | 302 | 1143 | |
392 | 1484 | 324 | 1227 | |
419 | 1586 | 346 | 1310 | |
446 | 1689 | 368 | 1393 | |
473 | 1791 | 399 | 1511 | |
500 | 1893 | 412 | 1560 |
Return Piping 10 Through 18 Section Boilers Install the two 4" NPT x 6" nipples per Figure 16. Assemble the rest of the return yoke as shown in Figure 16.
Control Installation
Locate the temperature & pressure gage, low water cutoff, high limit and operating controls per Figures 13
&7. Optional controls must be installed in accordance with the control manufacturers instructions and Figures 13 & 17.
NOTE: The front jacket panel MUST be installed before any controls are attached to the front boiler section!
CAUTION: The controls must be mounted in the correct location and according to the control manufacturer’s instructions or the boiler may not function properly!
Water Column Piping
A variety of water level controls are available for the 28A. The water column piping needed to properly mount each control is available from Smith. Figure 17 shows a typical water column piping arrangement. The 1" NPT x 7 1/2" nipple is always installed in the lower water column tapping, Figures 13 & 17 and Table 5.