SERIES 28A BOILER INSTALLATION AND OPERATION INSTRUCTIONS | Page 9 |
5.Insert the large port connector with its steel inner ring into the upper port.
6.Insert the two round port connectors into the lower ports.
NOTE: Apply the spray adhesive supplied with the boiler to the port recess to hold the port connector in place if necessary.
7.Select the correct intermediate section and carefully move it into place against the back section, Figure 4.
CAUTION: Any steam uptake and heater sections must be located as shown in Table 3. Failure to comply with this caution may result in poor boiler performance and prevent the jacket from fitting! Only one intermediate section with an external leg boss has been included. It should be located toward the front of the boiler for optional low water cutoff use. See Table 3.
NOTE: A putty knife or similar tool can be used to hold the port connectors in place while the intermediate section is positioned. It must be removed before the sections make contact or the port connector will be damaged resulting in a leak!
8.Insert the four draw rods through the casting bosses. Thread nuts onto one end of the rods. Place washers on the other end of the rods before threading nuts onto them. Snug the nuts finger tight. Use a spirit level to ensure that the first two sections are plumb and properly aligned, Figure 6. Check the rope to insure that it’s properly positioned. Once the sections are plumb and the rope and port connectors are properly positioned follow the torque sequence shown in Table 4.
Figure 6 - Section Alignment
Table 4 - Section Torque Sequence |
| ||
Step | Rod Position |
| Torque |
|
| ft lbs | Nm |
1 | Upper Right | 25 | 34 |
2 | Lower Left | 25 | 34 |
3 | Lower Right | 25 | 34 |
4 | Upper Left | 10 | 14 |
5 | Upper Right | 50 | 68 |
6 | Lower Left | 50 | 68 |
7 | Lower Right | 50 | 68 |
8 | Upper Right | 75 | 102 |
9 | Lower Left | 75 | 102 |
10 | Lower Right | 75 | 102 |
11 | Upper Left | 30 | 42 |
12 | Upper Right | 125 | 169 |
13 | Lower Left | 125 | 169 |
14 | Lower Right | 125 | 169 |
15 | Upper Right | 125 | 169 |
16 | Upper Left | 40 | 54 |
NOTE: With these initial torques the sections may not be metal to metal, which is acceptable. If any of the ports leak during the hydrostatic test the torque can be increased to 200 ft lbs, 271 Nm on the upper right rod. The torque on the lower left and right rods can be increased to 150 ft lbs, 203 Nm. Once the sections are metal to metal additional torque will not improve the seal.
Table 3 - Section Locations
Boiler |
|
|
|
|
|
|
| Section Location Numbered From Front To Back |
|
|
|
|
| |||||||
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Model | 1 | 2 | 3 | 4 | 5 | 6 | 7 |
| 8 | 9 | 10 | 11 | 12 | 13 |
| 14 | 15 | 16 | 17 | 18 |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
F | T | H | B |
|
|
|
|
|
|
| F | Front Section |
|
|
|
|
| |||
F | H | T | H | B |
|
|
|
|
|
| T | Intermediate Section w/ 5" Tapping & Boss |
| |||||||
F | T | H | T | H | B |
|
|
|
|
| H | Intermediate Section w/ Heater Opening |
| |||||||
F | T | H | P | T | H | B |
|
|
|
| P | Intermediate Section, Plain |
|
|
| |||||
F | T | H | P | H | T | H |
| B |
|
| B | Back Section |
|
|
|
|
| |||
F | T | H | P | H | P | T |
| H | B |
|
|
|
|
|
|
|
|
|
| |
F | H | T | H | P | H | P |
| T | H | B |
|
|
|
|
|
|
|
|
| |
F | H | T | H | P | T | P |
|
| T | H | B |
|
|
|
|
|
|
|
| |
F | H | T | H | P | T | H |
| P | H | T | H | B |
|
|
|
|
|
|
| |
F | H | T | H | P | H | T |
| P | P | H | T | H | B |
|
|
|
|
|
| |
F | H | T | H | P | H | T |
| H | P | H | P | T | H |
| B |
|
|
|
| |
F | H | T | H | P | H | P |
| T | H | P | H | P | T |
| H | B |
|
|
| |
F | H | T | H | P | H | P |
| H | T | H | P | H | P |
| T | H | B |
|
| |
F | H | T | H | P | H | P |
| H | T | H | P | H | P |
| H | T | H | B |
| |
F | H | T | H | P | H | P |
| H | P | T | H | P | H |
| P | H | T | H | B |