SERIES 28A BOILER INSTALLATION AND OPERATION INSTRUCTIONS

6.Vacuum out the burner base and clean and inspect all of the components. Replace any damaged or badly corroded parts.

7.Inspect the cleanout cover insulation and rope seal. If damaged or deteriorated replace them.

8.Install the clean out covers and reseal them with a silicone caulk rated for 500° F, 260° C.

9.Install the left jacket panels and remount the burner.

10.Restore electrical power and fuel to the boiler.

Vent System

Thoroughly inspect the vent system for any signs of blockage, corrosion or leakage. Immediately replace any unsound vent system piping.

Controls

1.Low water cutoff devices must be serviced per the manufacture’s instructions.

2.The relief valve should vent water when the test lever is lifted. It should not weep or discharge water at normal system pressure.

WARNING: Never try to clean or repair the relief valve! If the valve fails to operate properly, replace it! Failure to comply with this warning can result in an explosion causing extensive property damage, severe personal injury or death!

3.Use a combustion analyzer to ensure that the burner is adjusted properly, see BOILER OPERATION.