SECTION 5 - MOWER ATTACHMENT SERVICE

5.1.5. SPINDLE TO SPINDLE DECK BELT

INSTALLATION - 48", 52", & 61" CU'I-rlNG

DECKS

1.

Route

new belt for

48"

cutting deck,

52"

cutting

 

deck, and 61" cutting decks, onto bottom ,qroove of

 

center

Spindle

Pulley

and

Ieft hand

Spindle

Pulley.

 

See Figure 5.3.

 

 

 

 

 

 

2.

Install

cutting

deck

belt

according

to

CUTTING

4.Refer to the STANDARD BLADE REPLACEMENT

chart above for correct SNAPPER replacement Blades.

5.Should Blades be in acceptable condition, sharpen at 22 to 28 degrees. See Figure 5.5.

HEAVY END

DECK BELT INSTALLATION.

OF BLADE

BLADE

22° to 28°

5.2 CUTTING BLADE SERVICE

Check Blades at frequent intervals to insure they are securely tightened and in good condition. Replace if

chipped, bent, or notched. See Figure 5.4 for Blade wear limits.

1I64'

ORIGINAL CUTTING EDGE

FIGURE 5.5

lNEW BLADE

,_....._ WEAR LIMIT

{NOTCH STARTS)

DANGEROUS CONDITION!

DO NOT USE ON MOWER!

_REPLACEWITHNEW

BLADE.

FIGURE 5.4

1.Use the following chart for ordering replacement Blades for the 36", 48", 52" and 61" cutting decks.

36" DECK 48" DECK 52" DECK 61" DECK

ISTANDARD BLADE REPLACEMENT

7029246 7029247 7029246 7029251

5.2.1.BLADE REMOVAL AND SHARPENING

1.Move the Mower to a smooth, level surface, turn the Ignition Key to STOP position, remove Key, disconnect Spark Plug Wire from Spark Plug and secure Wire away from Plug.

2.Remove Blades.

NOTE: When sharpening Blades, leave 1/64" untouched. Razor sharp Blades will chip easily and dull quickly. Commercial baIancers are available and should be used in accordance with the manufactureCs instructions.

6.Balance each Blade after sharpening by grinding metal from the heavy end of the blade.

7.Place the Blade mounting bolt into Blade and place Blade spacers over bolt. Make certain each blade is installed with the same amount of spacers removed.

8.Install Blade mounting bolt with spacers and blade into spindle.

9.Install an equal amount of Blade spacers onto each

Blade mounting bolt.

10.Install the Blade mounting nut on each Blade mounting bolt. See Figure 5.6.

11.Torque each Blade mounting bolt and nut to 70 - 80 foot-pounds.

.,..--.- AIR LIFT

ADJUSTING

SPACERS

BLADE

__BEVELED

WASHER

WARNING

Take NOTE of the number of Blade Spacers that I are under the Blade Mounting Nuts and on the_

Spindle side of the Blade.

3.Clean and inspect each Blade for excessive wear and damage. See Figure 5.4 for Blade wear limits.

TIGHTEN TO70-80

MOUNTINGFOOTPOUNDS BOLT

FIGURE 5.6

25

Page 25
Image 25
Snapper SPLHI53KW Spindle to Spindle Deck Belt, Decks, Standard Blade Replacement, Blade Removal and Sharpening