
MZ-E300
3-3. MAIN BOARD
Note : On installation of main board, adjust the position of both switch (S809) and knob (HOLD).
1 Screws, tapping (1.7)
| Main board |
3 | Knob (HOLD) |
|
2Claw
3-4. OPTICAL PICK-UP ASSY
Optical
1 Washer
2 Gear (SA)
5
3 Screw (MI 1.4)
4 Spring, thrust detent
5