Southbend R2 manual Performance Check

Models: R2

1 21
Download 21 pages 29.24 Kb
Page 10
Image 10
PERFORMANCE CHECK:

4.If unit is to be installed on a counter top or other surface without using legs, the unit must be sealed to the surface to prevent any water, grease, etc. from accumulating under the steamer. The steamer can be bolted to the counter but will still have to be sealed. The installer may use G.E. or DOW CORNING RTV type sealant. (Consult local code for exact requirements.) See figure 5.

Steamer

 

\

Bottom View

Sealer

 

Sea nt

I

FIGURE 5

PERFORMANCE CHECK:

The following items should be checked within the first 30 days of operation by a qualified service technician.

1.Check doors for proper alignment.

2.Check door gaskets for wear and sealing ability.

3.Check spray tubes or nozzles for cleanliness and/or leakage.

4.Check all gauges, timers, valves and switches for proper operation.

5.Visually check control compartment wiring for burned or loose connections.

6.Check electrical load on elements for proper wattage.

7.Be sure operators understand the importance of proper cleaning and maintenance.

PAGE 9

Page 10
Image 10
Southbend R2 manual Performance Check