Table of Contents
Part 1
Installation
Page Number
Getting Started | 7 |
Installation Basics | 8 |
Component Placement | 9 |
Plumbing | 12 |
Parker Tube Fitting Assembly Procedure | 16 |
Wiring | 17 |
MPC Tank Switch Wiring and operation | 22 |
Membrane Pressure Vessel Relocation | 40 |
Z Brane Installation | 51 |
Operation |
|
New Systems Start Up and Testing | 24 |
Dry Testing | 27 |
Normal Start Up Using the Auto Run | 28 |
Automatic Fresh Water Flush Cycle | 29 |
Manual Operation | 31 |
Maintenance | 36 |
Bulletins | 44 |
Service & Maintenance |
|
Long Term Storage Procedures | 31 |
Winterizing | 34 |
Membrane Cleaning | 36 |
Salinity Probe Calibration | 38 |
Suggested Spares | 39 |
Newport Troubleshooting Procedures, Service Bulletins | 42 |
Part 2 Controls |
|
Programming from the display……………………………………………………………………………....13 | |
Tank Switch Operation and Installation …………………………………………………………………….16 | |
Programming from a Computer……………………………………………………………………………...16 | |
Software Installation…………………………………………………………………………………………17 | |
Software Port Settings …………………………………………………………………………………...….18 | |
Software Features …………………………………………………………………………………………...22 | |
Computer Settings …………………………………………………………………………………………..25 | |
Salinity Probe Calibration …………………………………………………………………………………..26 | |
Detailed Controls Data……………………………………………………….……………………………...28 |
5